Council Submissions & Project Management

One Team, From Council to Completion

A well-designed home still needs two things before it’s real: council approval, and someone keeping the build honest against what was actually approved. Most delays happen in the gap between those two — an application that sits with council longer than it should, or a project that drifts from its drawings once no one’s checking.
We handle both as one service. On the approvals side, that means knowing which of your Perth council’s pathways your project actually qualifies for, preparing the technical documentation each one needs, and lodging and following up directly so your application isn’t sitting untouched. Once approval comes through, we stay on: coordinating your consultants and builder, visiting site through construction, and checking progress against the approved drawings rather than handing you a stamped DA and stepping away.
This page covers our two services here: DA & Council Submissions, and Project Management. One team carrying the same knowledge of your project from the first lodgement through to handover.

From Lodgement to Handover

DA & Council Submissions

Development applications, deemed-to-comply checks, and owner builder applications, prepared and lodged with your council. Covers the planning application stage through to the building permit stage, with direct council liaison at both.

Project Management

Once approval is granted, we stay involved: coordinating your builder and consultants, visiting site to check progress against approved drawings, and managing the project through to practical completion and defects sign-off.

Why Choose Alaukik for Council Submissions & Project Management

15+ Years of experience in Council Submissions & Project Management in Perth
Homeowners and developers look for three things from whoever handles this side of a project: someone who knows how their specific council actually processes an application, someone who stays involved once approval comes through instead of handing it off, and a process that doesn’t leave them chasing updates. That’s the standard behind every council submission and project we manage. One team lodging your application and then staying on through construction. The same council relationships across every Perth suburb. Direct coordination with your builder and consultants so nothing falls through the gaps between them.

Questions? You’re covered.

What's the difference between a DA and a deemed-to-comply application in WA?
A deemed-to-comply application is a faster pathway for projects that meet set planning criteria outright, assessed by council without going to advertising. A full development application (DA) applies when a project doesn't meet one or more of those criteria and needs individual assessment, which usually takes longer and can involve neighbour consultation. We check your project against both before deciding which to lodge.
It varies by council and by how straightforward the application is. A deemed-to-comply application is generally faster than a full DA, and a full DA can take longer again if council requests further information or the project goes to advertising. We give you a realistic timeframe once we've assessed your specific project.
Often, yes, depending on size, height and how close it sits to a boundary. Some smaller structures fall under exemptions, but many still need either a planning approval or a building permit. We check this against your council's specific requirements before you build anything.
An owner builder approval lets you manage construction yourself rather than through a licensed builder, and WA requires a separate application and approval before building permit stage. We prepare and lodge this alongside your other council submissions where it applies.
Both. We don't stop at a stamped approval — we stay on to coordinate your builder and consultants, visit site through construction, and check progress against the approved drawings through to practical completion.
Regular site visits to check progress and quality against the approved drawings, ongoing coordination between your builder and consultants, and managing the project through to practical completion, defects lists and sign-off.
Yes. We coordinate with whichever builder you've engaged, keeping the design and consultant side aligned with their construction schedule.
We respond directly on your behalf, whether that's additional drawings, a specialist report or a clarification, and keep the application moving rather than leaving it to stall.
It depends on the pathway your project needs and how much site involvement the project management side requires. We give a fixed quote once we know your project's scope.

Ready to Move From Approval to Site?

DA lodgement, deemed-to-comply, owner builder approval, or full project oversight through construction. Start with a conversation about where your project stands.